Verified calculation capability
Single-phase or balanced sinusoidal three-phase (L-L) AC apparent power: amps↔VA and amps→kVA. · Electrical
Capability ID electrical.apparent_power · version 1.4.3
Single-phase apparent power
S = V_RMS × I_RMSS = √3 × V_L-L × I_LS_kVA = S_VA ÷ 1000P_est = S × λ_enteredSolve modes: amps-va · va-amps · amps-kva
Canonical symbols for this capability. Agent schemas remain the contract.
| Symbol | Quantity | Unit | Role |
|---|---|---|---|
primary | Current in A, or VA when mode=va-amps | — | input |
volts | RMS volts; L-L when phase=three | — | input |
phase | three = balanced sinusoidal line-to-line only | — | input |
power_factor | Optional total power factor λ in [0, 1] | — | input |
api_version | — | — | output |
api_contract_version | — | — | output |
spec_version | — | — | output |
page | Canonical calculator page URL | — | output |
links | — | — | output |
derived | Present when total power factor λ is supplied | — | output |
Declared scope for this capability. Do not use it outside this domain.
Assumptions
One numerical check. The calculator page holds worked steps and FAQ.
12 A, 230 V, 1φ → S = 2,760 VA (2.760 kVA)
CVP VERIFIED · CVP protocol 1.0.0-proposed · Engineering assurance. Computational verification is defined by CVP. Supplemental domain review (internal) and named expert review are defined by the Review policy and do not by themselves determine CVP conformance.
Human page, REST, and MCP share the same engine and calculation_version.
Build verified hashes workspace artifacts only. After deploy, attest:production GETs canonical URLs twice — the public/cached view an Agent actually hits, and origin — including every /capabilities/{id} HTML page. Public Capability HTML version must match catalog before production attestation passes. Live Trust rows above fetch /.well-known/calculatorx-production-attestation.json
and the output schema const. Build hashes: release integrity. That proves currently published page / engine / schema / evidence / MCP agree — not that a historical version is independently immutable. Reference Calculation Standard — Production surface contract 6/6.
Declared calculation modes for this capability.
amps-vava-ampsamps-kvaHuman-readable sources plus CVP reference evidence classes.
Sources
Reference evidence classes: O1 model · O2 expected_values · O2 numerical_behavior
Inspect this capability via same-origin MCP, then call execute_calculation.
curl -sS -X POST 'https://www.calculatorx.com/mcp' \
-H 'Content-Type: application/json' \
-H 'MCP-Protocol-Version: 2026-07-28' \
-H 'Mcp-Method: tools/call' \
-H 'Mcp-Name: inspect_capability' \
-d '{"jsonrpc":"2.0","id":1,"method":"tools/call","params":{"name":"inspect_capability","arguments":{"capability_id":"electrical.apparent_power"}}}'
Inspect the trust tier and required assurance level before execution. Pin calculation_version (1.4.3) when reproducibility matters. Full protocol notes: MCP docs.