Verified calculation capability
ISO 5167-6 uncalibrated wedge Q=C E A √(2Δp/ρ) with C=0.77−0.09β and β from circular-segment h/D. Not cone C=0.82, not ISA 1932, not RHG orifice, not ISO 5167-4 type C, not long-radius, not given C_d, not Q=Av, not Darcy. · Physics · Fluid
Capability ID physics.fluid.iso_wedge · version 1.0.0
Discharge
Q = C E A √(2Δp / ρ)β from circular-segment h/D · E = 1/√(1 − β⁴)C = 0.77 − 0.09 βSolve modes: flow · pressure · coefficient
Canonical symbols for this capability. Agent schemas remain the contract.
| Symbol | Quantity | Unit | Role |
|---|---|---|---|
D | Pipe inside diameter in m. Required. Envelope [50 mm, 600 mm]. Alternatives: D_m, pipe, pipe_D. Do not send nozzle D1+D2, orifice d+D, or cone d_c. | — | input / output |
h | Wedge gap in m. Required unless h_over_D or beta. Alternatives: h_m, gap, wedge_gap, wedge_h. Do not send tank head H. | — | input / output |
h_over_D | Wedge gap ratio h/D. Alternative to h. Envelope [0.20, 0.60]. Alternatives: hd, hD, wedge_ratio. | — | input / output |
beta | ISO wedge β from the circular-segment of h/D, not d/D and not √(1−(d_c/D)²). Alternative to h. Envelope [0.377, 0.791]. | — | input / output |
Re_D | Pipe Reynolds number on D. Required as the ISO envelope [1e4, 9e6], not a term in C. Alternatives: Re, ReD. Do not send ρ, μ, v. | — | input / output |
dP | Differential pressure in Pa. Required for flow. Alternatives: deltaP, dP_Pa, dp. | — | input / output |
rho | Density in kg/m³. Required for flow and pressure. | — | input / output |
Q | Volume flow in m³/s. Required for pressure invert. Alternative: flow, Q_m3_s. | — | input / output |
E | — | — | output |
A1 | — | — | output |
A | — | — | output |
C | — | — | output |
Cd | — | — | output |
v1 | — | — | output |
v2 | — | — | output |
model | — | — | output |
Declared scope for this capability. Do not use it outside this domain.
Assumptions
Not supported
One numerical check. The calculator page holds worked steps and FAQ.
D=0.1 h=0.05 Re_D=1e6 dP=10000 rho=1000 → C≈0.70636 Q≈0.014324
Review-policy: engine tested — automated tests, sources, version lock, and evidence published. Supplemental to CVP; not Domain Expert Review. See CVP and Review policy.
Human page, REST, and MCP share the same engine and calculation_version.
Build verified hashes workspace artifacts only. After deploy, attest:production GETs canonical URLs twice — the public/cached view an Agent actually hits, and origin — including every /capabilities/{id} HTML page. Public Capability HTML version must match catalog before production attestation passes. Live Trust rows above fetch /.well-known/calculatorx-production-attestation.json
and the output schema const. Build hashes: release integrity. That proves currently published page / engine / schema / evidence / MCP agree — not that a historical version is independently immutable. Production surface contract 1/1.
Human-readable sources plus CVP reference evidence classes.
Sources
Inspect this capability via same-origin MCP, then call execute_calculation.
curl -sS -X POST 'https://www.calculatorx.com/mcp' \
-H 'Content-Type: application/json' \
-H 'MCP-Protocol-Version: 2026-07-28' \
-H 'Mcp-Method: tools/call' \
-H 'Mcp-Name: inspect_capability' \
-d '{"jsonrpc":"2.0","id":1,"method":"tools/call","params":{"name":"inspect_capability","arguments":{"capability_id":"physics.fluid.iso_wedge"}}}'
Inspect the trust tier and required assurance level before execution. Pin calculation_version (1.0.0) when reproducibility matters. Full protocol notes: MCP docs.