Public evidence
Machine-checked verification for calculation version 1.2.1 · tier engine_tested
CVP status
CVP VERIFIED · CVP protocol 1.0.0-proposed · Engineering assurance
kW = kWh/h; kWh = kW·h
Legacy regression suite: 12/12 calculation tests · Production surface contract 6/6
Three distinct suites: educational examples on the calculator page, this legacy regression count (12/12 golden + boundary), and the CVP verification suite below. They are not the same number. Property, metamorphic, round-trip, O3, and interface statuses/checks are recorded in the CVP Manifest . SKIP (0/0) means that suite has no published vectors.
Protocol checks from the Evidence Manifest. Distinct from the legacy regression suite above. Calculation version 1.2.1. CVP 1.0.0-proposed. 2/2 golden · 1/1 CVP boundary · 1/1 invalid · 1/1 cross-interface · 6/6 CVP contract. digest 365c3f53d267.
Fingerprint sha256:3b1f9a97a4bef7f3e3ad1a5777c672b019cda4e25024e652548b3f332ad8c5fe
Input schema sha256:15e94bdaeb369eb16884b7f23b5426fcda9615d3442831a89762b371f15a39ea · Output schema sha256:36d2af1e3c274cf69da1c84268972a401f587d80e51258da41112048624e1531 · Build-time SHA-256 digests prove published artifacts agree with each other (release_integrity.scope=workspace). Production attestation GETs canonical URLs twice (public/cached view and origin), including Capability HTML, via npm run attest:production --write
(published at /.well-known/calculatorx-production-attestation.json) and fails if the public Capability page advertises a different calculation_version. This is artifact consistency, not an independent immutable release log.
Engine identity and declared limitations.
Standards and references supporting this tool specification. Methods are listed separately — they are algorithms, not bibliographic sources.
Golden and boundary cases from the legacy Evidence JSON. CVP property, metamorphic, round-trip, O3, and interface statuses/checks are recorded in the Manifest — including SKIP when a suite has no vectors.
| ID | Kind | Status | Detail |
|---|---|---|---|
48-24 | golden | pass | Expected 2 · Actual 2 |
100-10 | golden | pass | Expected 10 · Actual 10 |
100-1 | golden | pass | Expected 100 · Actual 100 |
kw-to-kwh | golden | pass | Expected 7.5 · Actual 7.5 |
1-5 | golden | pass | Expected 0.2 · Actual 0.2 |
2kw-24h-reverse | golden | pass | Expected 48 · Actual 48 |
linear-2x-E | golden | pass | Expected 4 · Actual 4 |
inverse-half-t | golden | pass | Expected 4 · Actual 4 |
soft-zero-t | golden | pass | Expected 0 · Actual 0 |
soft-zero-E | golden | pass | Expected 0 · Actual 0 |
soft-zero-P-reverse | golden | pass | Expected 0 · Actual 0 |
soft-zero-t-reverse | golden | pass | Expected 0 · Actual 0 |